Skip to content
SSPL

Housing societies and developers

From approval to handover for housing projects

Housing schemes need environmental approval before development, working sewerage and storm drainage at handover, and reliable services for residents for years afterwards. Problems buried underground are expensive to find by digging, and a delayed approval can hold up a whole project.

We support developers, housing societies and estate managers through each stage: screening and EIA or IEE reports at the start, camera surveys of drainage before handover and during operation, and solar and energy work for common services.

The challenge

Risks across a housing scheme life cycle

Development

  • Environmental approval from the EPA before construction begins
  • Baseline data on air, water, noise, soil and ecology for the EIA or IEE
  • Construction and demolition waste that needs a licensed route

Operation

  • Blocked, cracked or collapsed sewers and storm drains
  • Disputes over who is responsible for defects at handover
  • Common-area electricity costs for street lighting, pumps and water supply

How we help

Our support at each stage

  1. 01

    Screening and approval

    We confirm whether the scheme needs an IEE or an EIA, prepare the report with baseline surveys and an environmental management plan, and follow it through EPA review to approval.

  2. 02

    Construction

    We manage construction and demolition waste through our KP-EPA certified service and carry out the environmental monitoring your approval requires.

  3. 03

    Handover

    CCTV surveys of new sewer and drainage lines record their condition with video and a graded report, so the contractor fixes defects before you accept the work.

  4. 04

    Operation

    Planned preventive camera surveys across large estates, targeted surveys when blockages recur, and solar and energy audits to bring down the cost of common services.

Questions

Housing society questions

When should a housing society commission a drain CCTV survey?

Before accepting new lines from a contractor, after repairs to confirm the work, when blockages keep returning, and as a planned survey across large estates to find problems before they cause flooding or collapse.

Does a housing scheme need an IEE or an EIA?

That depends on the size and location of the scheme and on the regulations of the relevant EPA. We screen the project against the applicable regulations and tell you which report is required before work begins.

Talk to us about inspection and compliance for real estate and housing.